Hello,
As part of the continuous improvement of the quality and resilience of our services, we will carry out a scheduled technical intervention on the infrastructure hosting your VPS Performance 1 server.
This preventive maintenance operation aims to optimize the thermal efficiency of the chassis (replacement of ventilation systems and thermal paste) and to reorganize our uninterruptible power supply (ATS) equipment in order to improve the circulation of air flows within the bay.
Start date and time: Friday May 29, 2026 from 10:30 a.m.
Estimated downtime: Between 30 minutes and 1 hour
Estimated end time: 12:00 p.m.
Your hosting will be temporarily taken offline during this intervention window. Our technical teams will do everything possible to minimize this impact and restore your services as quickly as possible.